Implemented Projects
Rail Wheels Final Inspection Line (FIL-1)
In 2005 within the framework of the second stage of wheel-rolling production revamp at OAO Nizhniy Tagil Iron & Steel Works, being General Contractor SME Tomsk Electronic Company entered on Railroad Wheels Final Inspection Line project. The partners were the following companies: Wheelabrator Group (Toronto, Canada), NPO INTROTEST (Yekaterinburg), Research Institute LKP in co-operation with OMZ Viktoria (Khotkovo), the Fraunhofer Institute for Applied Research (Germany). In August 2007 this line underwent commercial testing successfully.
More information
|
|
Rail Wheels Final Inspection Line (FIL-2)
In September, 2005 as to expand functional capabilities of the equipment for Wheels Final Inspection Lines for Nizhniy Tagil Iron & Steel Works, our Company was engaged in revamping the existing Final Inspection Line-2. The main task of this work was equipping of the existing line with shot peening machines and application of anticorrosive protection without shutting the existing line down. This work was successfully completed and at the end of 2007 FIL-2 was put into service in full.
More information
|
|
Robotic Complex for Wheels and Tires Thermal Processing
In November, 2007 within the framework of the third stage of wheel-rolling production revamp at OAO Nizhniy Tagil Iron & Steel Works, under the contract with Andritz MAERZ GmbH Tomsk Electronic Company started developing conveying equipment and manipulators for Wheels and Tires Thermal Processing Line. On December 22, 2008 the first stage of the processing line was put into the operation.
More information
|
|
Rail Differential Heat Treatment by Means of Air According to TEC Technology
In 2007 the company developed and manufactured the first industrial module for rail heat treatment, enabling to receive the first positive results confirmed by findings of OAO NKMK laboratory. In 2009 SME TEC developed and started up the second industrial module, using which various process parameters were tried out. The positive results were confirmed by the following laboratories: CLK OAO NTMK (Nizhniy Tagil), OAO UIM (Yekaterinburg), VNIIZHT for compliance of heat treated rails with GOST R 51685 draft requirements.
More information
|
|
Resupply of Railroad Wheels Final Inspection Lines FIL-1 and FIL-2
January, 2012 - awarding of contract. As a work partner acts NPO INTROTEST (Yekaterinburg). Works are being performed on the operating wheels final inspection lines No. 1 and No. 2.
More information
|
|
Railroad Inspection Line for High-Speed Trains for MAANSHAN IRON & STEEL COMPANY LIMITED
During the period from May, 2011 to February, 2012 SME TEC Ltd. took part in implementation of project on production and control of railroad wheels for high-speed trains within the framework of contract with MAANSHAN IRON & STEEL COMPANY LIMITED (Maanshan, China).
More information
|
|
|
Contacts |
|
|