Integrated Solutions and Projects
AUTOMATION FOR OIL AND GAS INDUSTRY |
|
Customer /Facility |
Retrospective |
Scope of Work |
OAO Tomskneft VNK, OAO NK YUKOS |
- PCS for pad surface facilities |
1995 - 2006 |
Participation in equipment selection, designing, setup and commissioning. |
- PCS for Krapivinskoye oilfield |
2002 |
Pre engineering inspection. Development of technical requirements for manufacturing and packaged supply of process equipment and PCS. |
- PCS for Igolsko-Talovoye oilfield |
2004 - 2005 |
OAO Tomsknefteproduct, OAO Tomskneft VNK, OAO NK YUKOS |
- PCS for petrol stations: AZK #16, town of Strezhevoy AZK #5, 24, 52, AZK#4, AZK#60, city of Tomsk AZK#53, town of Seversk AZK #8, Tomsk Region, Melnikovo village |
2001 - 2004 |
Designing. Manufacturing and supply of low voltage units NKU-3. |
- PCS for patrol stations (AZK #24, 50, 52, 53) |
2001 - 2005 |
Designing of an automated control system for patrol stations. Manufacturing and supply of the equipment, installation supervision, commissioning and putting into operation. Technical maintenance during operation. |
OOO Tomsktransgas OAO Gasprom |
- UPTOiK fuel storage facilities |
2004 - 2005 |
PCS designing, manufacturing and supply of PCS and ESD, installation supervision, setup and commissioning. |
- Barabinskaya LPU fuel storage facilities |
2004 |
PCS designing. |
- Altaiskaya LPU fuel storage facilities |
2005 |
PCS designing. Equipment manufacturing and supply (GSM gas detectors). |
- PCS for surface facilities of Severo-Ostaninskoye oilfield |
2006 - 2007 |
Development of a technical assignment, detail design |
OOO Gasprom Transgas Tomsk OAO Gasprom |
- Major overhaul of an automatic control system for gas distribution stations (SAU GRS-1, GRS-3 city of Barnaul; SAU GRS Novoaltaiskaya, Liublinskaya, Krutinskaya, Narga, Novokolomino, Kargala, Melnikovo) |
2007 |
Development of design documentation for automatic control systems for gas distribution stations. |
- PCS for surface facilities of Kazanskoye NGKM |
2007 - 2008 |
Development of a technical assignment, detail design |
- Automated control system for Proskokovo compressor station units |
2008 |
Development of design documents for an automated control system for compressor station units within the central control system for KS Proskokovo |
- PCS for production training grounds for Training Center of OOO Gasprom transgas Tomsk |
2008 |
Development of technical design. |
-Production training grounds for Training Center of OOO Gasprom transgas Tomsk |
2008 |
Manufacturing and supply of equipment for ESD simulation, ESD emulators, automated workstation for the trainer and trainees, server stand, engineering station, software package; installation supervision, setup and commissioning. |
OAO Eastern Transnational Company |
- PCS for CTP of Sredne-Niurolskoye oilfield |
2004 - 2005 |
Designing, manufacturing and supply of PCS equipment. Installation supervision, setup and commissioning. |
- Sredne-Niurolskoye oilfield. Remote control system for pads. |
2006 |
- Booster pump station and water knock out unit of Kluchevskoye oilfield. |
2007 |
- Booster pump station and water knock out unit of Puglalymskoye oilfield. |
2007 |
PCS designing. |
- PCS for surface facilities of Pyglalymskoye oilfield |
2008
|
Development of design documents. |
OAO Novosibirskneftegas TNK-BP |
- Oil metering station for Barabinskaya LPDS |
2002 |
Designing, supply of PCS equipment. Installation of instrumentation networks. PCS setup and commissioning. |
- PCS for pad pumping station-2, booster pumping station with water knock out unit for Verkh-Tarskoye oilfield. |
2006 |
Installation of instrumentation networks, setup and commissioning of PCS. Supply, installation, setup and commissioning of the communication system equipment (remote control automation system, public address radio relay communication system). |
ZAO Sobolinoye OAO NK RussNeft |
- PCS for surface facilities of Bolotnoye, Kulginskoye, Yuzhno-Tabaganskoye oilfield. |
2006 - 2007 |
Development of a technical assignment, detail design. |
- PCS for Gurarinskoye oilfield |
2006 - 2007 |
Technical support and maintenance for PCS hardware and software. |
- PSC for oil transfer station for pipeline CTP Yuzhno-Tabaganskoye oilfield - oil delivery and acceptance point ZAO Tomskaya neft at Luginetskaya oilfield. |
2007 |
Development of a technical assignment, detail design. |
- PCS for power unit based on GTU of Gurarinskoye oilfield |
2008 |
Development of a technical assignment, detail design. |
OOO Nord Imperial "Imperial Energy" |
- PCS for OTP Snezhnoye |
2006 - 2007 |
Designing, manufacturing and supply of PCS equipment. Installation supervision, setup and commissioning. |
- OTP of Snezhnoye oilfield |
2007 - 2008 |
Installation of instrumentation networks, setup and commissioning for power units for 0.4 kW, installation and commissioning of the fire alarm. |
- PCS for Mayskoye oilfield |
2007 |
Instrumentation detail design. Construction of Mayskoye oilfield for the period of test production. |
- Sneznoye oilfield. Remote control system for pads. |
2008 |
Development of a technical assignment, design and estimate documentation. |
- PCS for Dvoynoye oilfield |
2008 |
Development of a technical assignment, detail design. |
OAO Nyagan TNK-BP |
- Condensate gathering unit for Krasnoleninskoy gas field |
2008 |
Development of design and estimate documents (various parts of design). |
|
|
AUTOMATION FOR PETROCHEMICAL INDUSTRY |
|
Customer /Facility |
Retrospective |
Scope of Work |
OOO Tomskneftekhim OAO Sibur |
Polypropylene Production |
- Control system for polypropylene granulation (SUPGP) |
1993 |
Development of detail documents, equipment manufacturing, installation supervision, setup and commissioning. |
- Control system for polypropylene packing and shipping (SKPU and OP) |
1995 |
- System for recording, displaying and alarm of process parameters (Wizard - M). Stage 0, 1, 2, 3 |
1999 - 2003 |
Development of detail documents, equipment manufacturing, installation supervision, setup and commissioning, startup of pilot operation. |
- PCS and ESD for gaseous wastes disposal |
2003 |
Development of detail documents, equipment manufacturing, installation supervision, setup and commissioning. |
- PCS and ESD for furnace B201 |
2003 - 2004 |
- Packaged supply of batching equipment and PCS for batching polypropylene powder and additives to extruder P-131 |
2004 - 2005 |
Development of detail documents, equipment manufacturing, installation supervision, setup and commissioning. |
- Distributed control system and ESD for Polypropylene Production |
2005 |
Technical assignment, technical design for PCS and ESD of the 1st stage. |
- System for control, alarm and lockup for cooler compressor Р30 и P30S |
2005 - 2006 |
Pre engineering inspection. Development of a technical assignment, technical and detail design. Equipment manufacturing, installation supervision, setup and commissioning. |
- System for automated control and lockup for extruder P131 |
2008 |
Development of technical design, detail documents, equipment manufacturing, installation supervision, setup and commissioning, startup of pilot operation. |
PS and GP Plant |
- Upgrade of control system for liquefied gases warehouse (SSG 1,2) |
2000 |
Pre-engineering inspection, development of design documents. |
- Design and supply of PCS equipment for SFLU |
2001 |
Pre engineering inspection. Development of a technical assignment, technical and detail design. Equipment manufacturing, installation supervision, setup and commissioning. |
- PCS and ESD for isothermal unit for ethylene storage |
2005 |
Feasibility study. Technical assignment for PCS and ESD. |
Benzole Plant |
- PCS and ESD for the Plant |
2001 - 2002 |
Organizing and running the tender for PCS and ESD of the Plant. Selecting the supplier for basic automation tools. |
Ethylene Plant |
- Packaged supply of the recording system for power resources, raw materials and final products |
2003 |
Pre engineering inspection, development of a technical assignment, manufacturing and supply of the routine metering system based on IVK MicroTEK, setup and commissioning. |
- PCS and ESD for the Plant |
2004 |
Organizing and running the tender for PCS and ESD of the Plant. Selecting the supplier for basic automation tools. |
- PCS and ESD for turbo unit B201 |
2004 - 2005 |
Development of a technical assignment, technical and detail design. Equipment manufacturing, supply and installation supervision. |
- PCS and ESD for steam superheater for F - 10A,B |
2005 - 2007 |
Development of a technical assignment, detail design, engineering, setup and commissioning, startup of the pilot and commercial operation. |
FiKS Plant |
- PCS and ESD of the 2nd process line for formalin production and KKF |
2004 - 2005 |
Development of a technical assignment, technical and detail design for PCS and ESD for the 2nd process line for formalin production and KKF of FiKS plant. Equipment manufacturing, supply, installation supervision, setup and commissioning. |
Monomer Production |
- PCS and ESD Plant |
2004 |
Organizing and running the tender for PCS and ESD of the Plant. Selecting the supplier for basic automation tools. |
- PCS and ESD for turbo unit M2 |
2004 - 2005 |
Development of a technical assignment, technical and detail design. Equipment manufacturing, supply and installation supervision. |
- PCS and ESD for steam superheater for F - 10A,B |
2005 - 2007 |
Development of a technical assignment, detail design, engineering, setup and commissioning, startup of the pilot and commercial operation. |
- PCS and ESD for compressor and steam drive turbine M-1, M-5, M-6 |
2007 - 2008 |
Development of a technical assignment, detail design, engineering, setup and commissioning. |
Methanol Plant, OOO Tomskneftechim |
- Control system for methanol loading into railway tanks |
1998 |
Development of detail documents, equipment manufacturing, installation supervision, setup and commissioning. |
Methanol Plant (OOO Sibmetachim), OAO Vostokgasprom, OAO Gasprom |
- Plant for methanol production M-750 |
2005 - 2006 |
Development of a technical assignment, detail design for ESD system. |
- ESD system (workshop 201) |
2006 |
Development of a technical assignment, technical and detail design. |
- Methanol production plant M-750. Distributed control system for synthesizing and rectification |
2007 - 2008 |
Development of a technical assignment, detail design for distributed control system. |
2008 - 2009 |
Equipment manufacturing, supply, installation supervision, setup and commissioning. |
|
|
|